We never take large deposits or get paid ahead of time for the work we do to to ensure a timely project completion and quality job.
Mon | 07:00 am – 04:00 pm | |
Tue | 07:00 am – 04:00 pm | |
Wed | 07:00 am – 04:00 pm | |
Thu | 07:00 am – 04:00 pm | |
Fri | 07:00 am – 04:00 pm | |
Sat | Closed | |
Sun | Closed |
Our Team is dedicated to bringing quality and value with each and every project we do. Experience in modern building products and tried and true construction application techniques makes a big difference. We get proper permits and inspections on our jobs for your safety and resale value of your project. From additions and renovations to kitchen and bath replacements, we are your team!
We will work with you on your product selections and budget to accurately scope and price your particular project(s). We build your project on our fixture and finish system first to accurately budget each project. We do this to ensure our Project Manager has your selected products confirmed and guarantee that the project is completed in a timely manner and on budget.
We prefer our clients be educated on their remodeling project and not sold on it. Our product consultants help dial in your selections to your taste. We don't have commissioned sales people so you can reinvest these commissions back into your project! We are very competitive and bring great quality and value at our price points. Even if
We prefer our clients be educated on their remodeling project and not sold on it. Our product consultants help dial in your selections to your taste. We don't have commissioned sales people so you can reinvest these commissions back into your project! We are very competitive and bring great quality and value at our price points. Even if we cost slightly more than your other bidders we will likely make up the difference somewhere!
Email us for a full scope and budget breakdown of our pre-priced kitchen projects info@bairgroupllc.com
Up to 9x11 Remodel (Refacing and finishing) 3 weeks
Cost starting at $20,000
Includes
*Demolition of current finishes except cabinetry frames and boxes
*Replace cabinet doors with custom size shaker style maple doors with hidden hinges and slab drawer fronts
*Install new ¾” edged, sanded and clear polyurethane finished shelves
*Sand, prep and paint cabinet frames, doors and drawers 3 coat latex base finish system (any Sherwin Williams color
*Up to 50 square feet level B granite tops
Complete Replacement (Remodel Semi Custom) 4 weeks
Up to 9x11 Kitchen Existing plumbing and electrical
Level 1 Complete Replacement (Minor Remodel – “Box Store Style”) builder cabinets granite level B tops 4 weeks
Includes
*Total tear out of all cabinets and counter tops
*$10,000 allowance for cabinetry products with standard size base cabinets and standard 30”high wall cabinets
*$4,000 allowance for Level B counter tops, undermount sink, new disposal and Delta Arabella faucet
Complete Replacement (Major Remodel Semi Custom) 5 weeks
Up to 10x12 Kitchen Moderate Plumbing & Electrical
Cost starting at $45,000 subject to actual product selections
Includes
*Total tear out entire kitchen including total demo of cabinets, appliances, electrical wiring and floors
Includes
$15,000 allowance for cabinetry products and related parts
$7,000 allowance for counter tops, sink, disposal and faucet
Up to 12x14 Kitchen - Major Plumbing & Electrical + Peninsula
Total Replacement (Major Remodel Custom Plus) 6 weeks
Cost starting at $60,000 subject to actual product selections
Includes
$20,000 allowance for cabinetry products and related parts
$7,500 allowance for counter tops, sink, disposal and faucet
Up to 14x16 Kitchen - Major Plumbing & Electrical + Island
Complete Replacement (Major Remodel Custom Plus) 6 weeks
Cost starting at $75,000
Includes
$25,000 allowance for cabinetry products with finished end panels, deco moldings, etc.
$10,000 allowance for counter tops, sink, disposal and faucet
Up to 16x20 Kitchen Major Plumbing & Electrical + Island
Complete Replacement (Major Remodel Custom Plus) 7 weeks
Cost starting at $90,000
Includes
$30,000 allowance for cabinetry products with finished end panels, deco moldings, etc.
$15,000 allowance for counter tops, sink, disposal and faucet
Actual budgets based on actual size and product selections
1/2 Bath or Level 1 remodel Cost from $4,495
* Does not require or include permits
* Includes $1000 allowance for tile and fixtures
* Does not include plumbing valve or re-drain work
*Requires completed fixture and finish schedule prior to scheduling work
Level 1 partial tear out Cost from $9,500
* Does not require or include permits (keep existing plumbing)
* Keep existing tub and valves
* Price includes a $750 tile product allowance
*Price includes a $1,000 plumbing fixture / product allowance
*Off the shelf box store products
Level 2 total tear out Cost from $14,995
* Includes county permits and inspections through final
* Price includes a $1,000 tile product allowance
*Price includes a $2,500 plumbing fixture / product allowance
*Upgrade to brushed nickel or bronze for additional $150
*Upgrade tub to custom standup shower with tile base floor $500
*Requires completed fixture and finish schedule prior to scheduling
Level 3 total tear out tub or shower Cost from $21,250
*Price includes a $2,000 tile product allowance for natural stone
*Price includes a $2,500 plumbing fixture product allowance
*Price includes a $750 Delta satin nickel / silver gliding door
*Price includes a $2,000 custom frameless shower enclosure
*Requires completed fixture and finish schedule prior to scheduling
Total tear out (tub + separate shower) Cost from $29,500
* Price includes a $2,500 tile product allowance for natural stone
*Price includes a $5,000 fixture finish allowance
*Price includes a $2,000 custom frameless shower enclosure
*Requires completed fixture and finish schedule prior to scheduling
Total tear out (tub + separate shower) Cost from $37,250
*Price includes a $3,000 tile product allowance for natural stone
*Price includes a $7,000 fixture finish product allowance
*Price includes a $2,000 custom frameless shower enclosure
*Requires completed fixture and finish schedule prior to scheduling
Total tear out (tub + separate shower) Cost from $44,500
* Price includes a $4,000 tile product allowance for natural stone
*Price includes a $9,000 fixture finish product allowance
*Price includes a $2,000 custom frameless shower enclosure *Requires completed fixture and finish schedule prior to scheduling
Remodel it right the first time with us!
.
.
.
.
.
Be the first to hear about property improvement tips and updates from our latest projects.
Up to 5x8 bath 1/2 Bath or Level 1 remodel Cost from $4,495
Up to 5x8 bath Level 1 partial tear out Cost from $9,500
Up to 6x9 bath Level 2 total tear out
Tub or Shower
Cost from $14,995
Up to 6x10 bath Level 3 total tear out Tub or shower all new plumbing
Delta or Kohler gliding shower door
Cost from $21,250
Up to 8x12 bath Level 4 total tear out
Tub + separate shower all new plumbing
Frameless glass enclosure and hardware
Cost from $29,500
Up to 10x14 bath Level 5 Total tear out Tub + separate shower all new plumbing
Frameless glass enclosure and hardware Cost from $37,250.